Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ravestein to Build Dredger for ETERMAR SA (The Netherlands)
Business & Finance

September 5, 2013 · about 13 years ago

Ravestein to Build Dredger for ETERMAR SA (The Netherlands)

Ravestein has been awarded the contract for the design and construction of a backhoe dredger type Ravestein 750 B for ETERMAR SA. The vessel will be delivered in July 2014. ETERMAR SA was founded in 1968 and is currently one of Portugal’s most experienced companies working in the maritime and fluvia

2 minutes read
  • LinkedIn
  • X
  • Email

Ravestein has been awarded the contract for the design and construction of a backhoe dredger type Ravestein 750 B for ETERMAR SA. The vessel will be delivered in July 2014.

ETERMAR SA was founded in 1968 and is currently one of Portugal’s most experienced companies working in the maritime and fluvial hydraulic works sector.

The company has its headquarters in Setúbal, which house the head offices and the electromechanical, carpentry and metal workshops, in addition to a shipyard, in the Sado river estuary for naval maintenance, repairs and construction, endowed with considerable resources.

For Ravestein this will be the third order for a backhoe dredger of the new series of Ravestein Backhoe Dredgers in a short time. The previously ordered dredger was delivered to DEME/NDC and currently, there is a Backhoe dredger for Jan de Nul under contract with a delivery due in January 2014, both featuring Liebherr P995.

The new Backhoe dredger will have the following dimensions:

Length: 50.00 meter;

Width: 15.50 meter;

Depth: 4.00 meter;

Dredging depth up tot: 22.00 meter;

Total installed power: 1.520 kW;

Crane: Liebherr P 9350.

The pontoon has three spud legs and one hydraulically operated spud carrier. The legs can each press 280 tons and have a holding force of 560 tons, whereas the spuds will feature 1.60 x 1.60 meters in size.

Ravestein will build the Backhoe dredger completely in their yard in Deest Holland. The crane will be transported from Liebherr Colmar France and will be installed in Deest.

[mappress]

Press Release, September 5, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago