Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: Braunton Flood Defence Program About to Begin
Business & Finance

September 10, 2013 · about 13 years ago

UK: Braunton Flood Defence Program About to Begin

The Environment Agency will start work next week on a £100,000 scheme to boost flood protection in Braunton. The North Devon village suffered serious flooding in December 2012 after torrential rain caused the River Caen to over-top flooding more than 60 local homes and businesses. The flooding occur

2 minutes read
  • LinkedIn
  • X
  • Email

The Environment Agency will start work next week on a £100,000 scheme to boost flood protection in Braunton.

The North Devon village suffered serious flooding in December 2012 after torrential rain caused the River Caen to over-top flooding more than 60 local homes and businesses. The flooding occurred six months after the official opening of a new flood defence scheme.

‘ We built a scheme offering protection for a 1:100 year event. Amazingly, even this wasn’t enough to contain the exceptionally high flows in the River Caen in 2012. Put simply – the sheer volume of water coming down the river was more than our scheme was designed to take ,’ explained Jim Faux for the Environment Agency .

The December 2012 floods resulted from some of the highest flows ever recorded in the River Caen. The last time flows were as high was in 1894. It is estimated as many as 200 properties in Braunton would have flooded if the new scheme hadn’t been in place.

Over the next four weeks the Agency will be upgrading Braunton’s flood defences through a series of improvements. The main work will take place in the Memorial Gardens where approximately 100 metres of embankment will be raised.

Various sections of riverside walls will also be raised downstream of the Memorial Gardens to keep as much water as possible within the river channel and provide the people of Braunton with the best available flood protection.

An important component of the existing scheme is a culvert around Hordens Bridge that helps convey water downstream during high flows. ‘It performed well during 2012 and should continue to help reduce the risk of flooding in the future along with the latest improvements we’re making to the Braunton scheme,’ said Jim Faux.

Work on the town’s flood scheme will start on September 16 and should be completed by the end of October.

[mappress]

Press Release, September 10, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago