Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USACE Finalizes Draft L.A. River Study Report (USA)
News

September 15, 2013 · about 13 years ago

USACE Finalizes Draft L.A. River Study Report (USA)

The U.S. Army Corps of Engineers finalized preparation of a draft report for the Los Angeles River Ecosystem Restoration Feasibility Study and posted the report to the Los Angeles District website Sept. 13. The report will appear in the Federal Register Sept. 20, which will trigger a 45-day public c

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers finalized preparation of a draft report for the Los Angeles River Ecosystem Restoration Feasibility Study and posted the report to the Los Angeles District website Sept. 13.

The report will appear in the Federal Register Sept. 20, which will trigger a 45-day public comment period that will help inform a final report and result in the Corps’ recommendation to Congress.

The study recommends improvements that would restore ecological value and habitat to the Los Angeles River corridor, from Griffith Park to downtown Los Angeles.

The draft report details four action alternatives named 10, 13, 16 and 20, in addition to a no-action alternative, and identifies alternative 13 as the U.S. Army Corps of Engineers tentatively selected plan, or TSP.

“ We are asking for comments on all four alternatives, and the Corps will consider every comment before a final recommendation is made ,” said District Commander Col. Kim Colloton.

“ That is why the selection of an alternative, at this point in the process, is ‘tentative.’ Transparency and community involvement are vitally important to this effort .”

Colloton said the Corps, City of Los Angeles and stakeholders collaborated to put forward alternatives that would improve the L.A. River ecosystem in a constrained funding environment.

“ The number one priority of the study is to restore the river’s ecosystem while preserving the flood protection that is provided by the existing channel system,” Colloton said . “Alternative 13 does this, while restoring 588 acres of valley foothill riparian wildlife habitat and aquatic habitat at a cost of around $453 million. ”

The Corps evaluated the four alternatives for costs, benefits and impacts.

“ Hundreds of ideas were explored, and the best of these were combined to come up with the final array of alternatives in the draft report ,” she said. “ After evaluating each alternative, number 13 was selected as the National Ecosystem Restoration Plan that most reasonably maximizes net restoration benefits. ”

The 11-mile stretch of river that is the focus of the study exits in the nation’s second largest urban region, and improvements have the ability to positively impact millions of people, as well as the flora and fauna.

Colloton said, “ We and our partners have put tremendous effort into developing the alternatives, and we appreciate any and all comments .”

[mappress]

Press Release, September 16, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago