Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Keansburg Beach Replenishment Set for This Fall (USA)
News

September 17, 2013 · about 13 years ago

Keansburg Beach Replenishment Set for This Fall (USA)

Congressman Frank Pallone, Jr. (NJ-06) announced that the contract has been awarded and work will begin this fall on a $36 million beach replenishment project in Keansburg. This Army Corps of Engineers project, which is funded at full federal expense, will restore beaches in Keansburg to conditions

1 minutes read
  • LinkedIn
  • X
  • Email

Congressman Frank Pallone, Jr. (NJ-06) announced that the contract has been awarded and work will begin this fall on a $36 million beach replenishment project in Keansburg.

This Army Corps of Engineers project, which is funded at full federal expense, will restore beaches in Keansburg to conditions better than prior to Sandy and was made possible by the Sandy aid package passed by Congress.

The contractor, Great Lakes Dredge Dock, LLC, of Oak Brook, Illinois, will pump 1.1 million cubic yards of new sand and is required to complete the work within 200 days of starting.

“ Many residents and businesses in Keansburg have been continuously impacted by serious flooding, and during Sandy the community suffered damage unlike it had ever before. ” said Pallone. “ I’m pleased that the Army Corps is moving forward with this historic investment that will help to protect area homes and businesses from future flooding, as well as repair the destruction caused by Sandy. I have fought for this and other beach replenishment projects for years, because I know how important they are to protect some of our most fragile coastal infrastructure.”

The new contract award announced today is part of the larger Keansburg Storm Damage Reduction Project, which includes a previously announced contract to repair Keansburg’s levees, remove debris, and fix a damaged wing wall.

Work on the levee repair will also begin this fall.

[mappress]

Press Release, September 17, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago