Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Port of Seattle Ready for Final Terminal 30 Cleanup
Business & Finance

September 25, 2013 · about 13 years ago

USA: Port of Seattle Ready for Final Terminal 30 Cleanup

A proposed amendment to a 1991 legal agreement between the Port of Seattle and the Washington Department of Ecology (Ecology) will authorize the port to propose a cleanup plan for contaminated soil and groundwater at a portion of Terminal 30 on the Seattle waterfront. Ecology seeks public comment on

1 minutes read
  • LinkedIn
  • X
  • Email

A proposed amendment to a 1991 legal agreement between the Port of Seattle and the Washington Department of Ecology (Ecology) will authorize the port to propose a cleanup plan for contaminated soil and groundwater at a portion of Terminal 30 on the Seattle waterfront.

Ecology seeks public comment on the amendment through Oct. 21. The port investigated contamination from a former fuel terminal and other past uses on the site and conducted several cleanup projects under the original 1991 order.

The cleanup plan to be completed under the amendment will be made available for public review and a future Ecology comment period. Ecology also will seek future comment on the port’s investigation and study of cleanup alternatives.

The cleanup site occupies 11 acres of the 34-acre Terminal 30 facility at 1901 E. Marginal Way S. in Seattle. Prior to its purchase by the port in 1985, the site contained a fuel terminal, a lumberyard, machine shop, and shipyard, constructed on fill material along the East Waterway of the Duwamish River. Studies have identified petroleum and related materials in soil and groundwater.

Starting in the 1980s, the port conducted several cleanup projects, called interim actions, while continuing studies needed for a draft cleanup action plan.

[mappress]

Press Release, September 26, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago