Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Pallone Announces USD 1.8 M Grant to Repair Sandy Damage (USA)
Business & Finance

September 29, 2013 · about 13 years ago

Pallone Announces USD 1.8 M Grant to Repair Sandy Damage (USA)

Congressman Frank Pallone, Jr. announced that FEMA has awarded $1,833.961 in federal funding to Middlesex County to repair the beach, dunes and groins at the Old Bridge Waterfront Park damaged as a result of Hurricane Sandy. This area sustained significant damage during Sandy and this FEMA funding,

1 minutes read
  • LinkedIn
  • X
  • Email

Congressman Frank Pallone, Jr. announced that FEMA has awarded $1,833.961 in federal funding to Middlesex County to repair the beach, dunes and groins at the Old Bridge Waterfront Park damaged as a result of Hurricane Sandy.

This area sustained significant damage during Sandy and this FEMA funding, which will pay for 90% of the total project cost, will work to restore the area to pre-storm conditions.

“This critical funding will bring us a step closer to rebuilding the Old Bridge Waterfront Park, and help restore normalcy in the aftermath of Superstorm Sandy, ” said Pallone. “ We still have a long way to go to, but I am pleased to see that there is positive movement toward rebuilding from the storm.”

The work for this project has been divided into two geographical sections. Section 1 will include installing 54,400 cubic yards of sand to the beach, repairing the dunes by placing 4,630 cubic yards of sand with plantings for erosion control, and repairing the groins by installing handrails and fixing damaged concrete. Section 2 will include installing 5,500 cubic yards of sand to the beach.

[mappress]

Press Release, September 30, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago