Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Corps Awards Contract for Chicago Shoreline Project
Business & Finance

September 30, 2013 · about 13 years ago

USA: Corps Awards Contract for Chicago Shoreline Project

On Sept. 27, the U.S. Army Corps of Engineers, Chicago District awarded an $11,369,089 contract to Illinois Constructors Corp. for the Chicago shoreline storm damage reduction project from Montrose Harbor to Irving Park Road. Illinois Constructors Corp., of Elburn, Ill., is certified as a small busi

2 minutes read
  • LinkedIn
  • X
  • Email

On Sept. 27, the U.S. Army Corps of Engineers, Chicago District awarded an $11,369,089 contract to Illinois Constructors Corp. for the Chicago shoreline storm damage reduction project from Montrose Harbor to Irving Park Road. Illinois Constructors Corp., of Elburn, Ill., is certified as a small business concern.

The project consists of replacing 2,600 feet of deteriorated step-stone revetment at the Lake Michigan shoreline between Montrose Harbor and Irving Park Road. This project is one of 23 segments repairing 9.5 miles of Lake Michigan shoreline in Chicago. The overall project will be approximately 80 percent complete with completion of this segment.

The new structure consists of rubble mound with a combination of new and reused clean stone placed over the existing structure. The rubble mound structure will extend between 30 and 60 feet lakeward of the toe of the existing structure impacting 2.58 acres of lakebed. Backshore areas will be stabilized with sod and a new bike path/stone access road will constructed. Other features of the project include construction of a universal access point that will provide transition to the bike path/access stone road at the south end of the project, and resurfacing of the fishing pier at Montrose Harbor. To comply with historic preservation requirements, the top two steps of the existing revetment will be maintained.

Construction is set to begin spring 2014 and end July 2015. Local sponsors are the Chicago Department of Transportation and Chicago Park District.

[mappress]

Press Release, October 1, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago