Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Taizhou Terminal Development Project Includes Dredging (China)
Business & Finance

October 13, 2013 · about 13 years ago

Taizhou Terminal Development Project Includes Dredging (China)

CCCC Second Harbor Engineering Co., Ltd. has recently won the bid for the coal unloading terminal project of Taizhou Second Power Plant, with a contract value of 118 million yuan and a construction period of 14 months. Located in Sanmen County, Taizhou City, Zhejiang Province, the project involves a

1 minutes read
  • LinkedIn
  • X
  • Email

CCCC Second Harbor Engineering Co., Ltd. has recently won the bid for the coal unloading terminal project of Taizhou Second Power Plant, with a contract value of 118 million yuan and a construction period of 14 months.

Located in Sanmen County, Taizhou City, Zhejiang Province, the project involves a 35,000 coal unloading terminal (designed to berth 50,000t bulk carriers in terms of hydraulic structure), the front part of the terminal approach, dredging of a 140,000-cubic-meter basin, land arrangement and related supporting facilities, as well as auxiliary works such as water supply and drainage, electric, communications and heating & ventilation works within this range.

The terminal berth has a length of 292 meters, a width of 28 meters and a designed annual through capacity of 4.7 million tons.

After its completion, the project will effectively ease the pressure of power consumption over Taizhou and Zhejiang, and be of great significance to improving the power grid structure, increasing power supply quality, accomplishing the optimal allocation of resources and driving the economic development of Sanmen, Taizhou.

[mappress]

Press Release, October 14, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago