Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Davenport Project: Corps Hosts Ribbon Cutting Ceremony (USA)
Business & Finance

October 22, 2013 · about 12 years ago

Davenport Project: Corps Hosts Ribbon Cutting Ceremony (USA)

The public and media are invited to attend a ribbon cutting ceremony celebrating the substantial completion of the U.S. Army Corp of Engineers flood risk management project protecting the Davenport, Iowa, Iowa American Water Treatment Plant in Davenport, Iowa, announced usace.army.mil. The ceremony,

2 minutes read
  • LinkedIn
  • X
  • Email

The public and media are invited to attend a ribbon cutting ceremony celebrating the substantial completion of the U.S. Army Corp of Engineers flood risk management project protecting the Davenport, Iowa, Iowa American Water Treatment Plant in Davenport, Iowa, announced usace.army.mil.

The ceremony, hosted by the Corps’ Rock Island District, takes place Oct. 24 at 9:30 a.m. on the grounds of the water treatment plant which is located near the intersection of Mound Street and River Drive, across from the East Village of Davenport.

Davenport Mayor Bill Gluba will be on hand to help celebrate as the City of Davenport was the Corps’ primary partner in this endeavor.

The project is part of the Davenport Flood Risk Management project originally authorized in 1970. This particular phase of the project began in September of 2011 with a construction contract awarded to Valley Construction Co. of Rock Island. The current construction cost is $7.9M and the completed project provides a flood wall to protect the water treatment plant which provides drinking water to not only Davenport, but Bettendorf, Le Claire and rural Scott County, Iowa.

The completed flood risk management project includes a 2,000-foot flood wall and 140-foot levee. Also, two 20-foot swing gates were constructed to provide railroad closures and one 20-foot swing gate was installed to provide the capability to close an access road. The overall height of protection equates to a river stage of 31.4 feet. The flood of record in this area was in 1993 when the river stage reached 22.63 feet.

[mappress]

Press Release, October 23, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago