Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›NQBP: Closure of Mackay Breakwater for Maintenance (Australia)
Business & Finance

October 24, 2013 · about 12 years ago

NQBP: Closure of Mackay Breakwater for Maintenance (Australia)

The southern breakwater at the Mackay Marina will be closed to the public from Monday 4th November to mid-February next year for general maintenance works. The maintenance work will require placement of about 30,000 tonnes of hard rock along approximately 400 meters of the outer side of the breakwat

1 minutes read
  • LinkedIn
  • X
  • Email

The southern breakwater at the Mackay Marina will be closed to the public from Monday 4th November to mid-February next year for general maintenance works.

The maintenance work will require placement of about 30,000 tonnes of hard rock along approximately 400 meters of the outer side of the breakwater wall. This will involve the use of heavy lifting cranes and trucks accessing the breakwater road. Individual rocks will vary in size from about one tonne up to eight tonnes.

The maintenance works will be complemented by upgrading of the bitumen road in places where wave action has affected the surface.

From next year, NQBP plans an ongoing annual maintenance works program to be undertaken between around June and September each year. As with this year’s maintenance works program, public access to the breakwater will be closed during such future works.

Operations at the breakwater will be undertaken between the hours of 6:00am and 6:00pm Monday to Saturday and every effort will be made to minimise disruption to nearby residents and businesses.

As the breakwater will be a construction site it will be closed to public access on a 24/7 basis until access is reinstated.

[mappress]

Press Release, October 25, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago