Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: EPA Removes Hyde Park Landfill from Superfund List
Business & Finance

November 4, 2013 · about 12 years ago

USA: EPA Removes Hyde Park Landfill from Superfund List

The U.S. Environmental Protection Agency has finalized its decision to remove the Hyde Park Landfill site in Niagara Falls, New York, from the Superfund National Priorities List of hazardous waste sites after a successful cleanup. The ground water and the sediment in Bloody Run Creek and Niagara Gor

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Environmental Protection Agency has finalized its decision to remove the Hyde Park Landfill site in Niagara Falls, New York, from the Superfund National Priorities List of hazardous waste sites after a successful cleanup.

The ground water and the sediment in Bloody Run Creek and Niagara Gorge Face were contaminated with volatile organic compounds, which can cause serious harm to people’s health. The EPA concluded that the work to reduce contamination in ground water and creek sediment has eliminated the threat to public health and the environment.

The cleanup included capping the landfill and areas around its perimeter to prevent water from flowing through it and constructing a system to collect and treat the contaminated oily substance leaching out of the landfill. In addition, ground water is pumped inwards toward the landfill and then treated to prevent contamination from spreading to surrounding bodies of water.

The ground water, which continues to be treated to reduce contamination, is not used for drinking water. The contaminated sediment in Bloody Run Creek and Niagara Gorge Face was removed and the cleanup work at the site was completed in September 2003. The cleanup work was conducted by the Occidental Chemical Corporation, the company responsible for the contamination, with EPA oversight to ensure that the actions taken were effective and protective of people’s health.

Ground water is sampled quarterly and the EPA reviews quarterly and annual sampling reports to determine that the cleanup goals have been met. An environmental easement that imposes restrictions on the use of the property to prohibit building or any other activity that could potentially damage the cap was placed on the property in 2010. The EPA has concluded that the cleanup work has been effective and that the site can now be taken off of the Superfund list.

[mappress]

Press Release, November 5, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago