Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Koper: Obtained Permits for Construction of Landfills for Dredging (Slovenia)
Business & Finance

November 8, 2013 · about 12 years ago

Koper: Obtained Permits for Construction of Landfills for Dredging (Slovenia)

Luka Koper received this week from the Ministry of Environment and Spatial Planning the building permits for the construction and filling of the landfills 7A and 799/29. The landfills will serve for the disposal of the excavated material in the dredging of Port Basin I along the quayside aimed at co

1 minutes read
  • LinkedIn
  • X
  • Email

Luka Koper received this week from the Ministry of Environment and Spatial Planning the building permits for the construction and filling of the landfills 7A and 799/29.

The landfills will serve for the disposal of the excavated material in the dredging of Port Basin I along the quayside aimed at container handling.

Luka Koper reached an agreement with the selected contractors so that the works will be accelerated in order to allow smooth disposal of the dredged material from the port’s Basin I and thereby smooth dredging operations.

The selected contractors, i.e. Krk d.o.o. and Grafist d.o.o., will be introduced in work in the following days.

[mappress]

Press Release, November 8, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago