Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Fan Pier Gets OK for New Work in South Boston
Business & Finance

November 13, 2013 · about 12 years ago

USA: Fan Pier Gets OK for New Work in South Boston

Fan Pier Development, LLC, received a permit from the U.S. Army Corps of Engineers, New England District in 2007 to install structures and discharge fill material within the waters of the U.S. in conjunction with redevelopment of the Fan Pier in South Boston, Mass. The authorized work included the p

1 minutes read
  • LinkedIn
  • X
  • Email

Fan Pier Development, LLC, received a permit from the U.S. Army Corps of Engineers, New England District in 2007 to install structures and discharge fill material within the waters of the U.S. in conjunction with redevelopment of the Fan Pier in South Boston, Mass.

The authorized work included the placement of fill material for reconstruction of the seawall along the Boston Harborwalk, the removal of a stone revetment to connect the Fan Pier Tidal Park to Boston Harbor, a floating wave attenuator, a touch and go dock, installation of fixed piers and floating docks, and the placement of fill material associated with the substrate recontouring within Fan Pier Cove.

Some of the authorized work has been completed. The permittee has now requested that the permit expiration date be extended to Dec. 31, 2019 to allow sufficient time for the remaining authorized work to be completed. Authorization also has been requested for an additional 20-foot-wide pier extending off the seawall at an approximately 30 degree angle. One side extends 36 feet, 3 inches seaward of the mean high water line at the seawall and the opposite side extends 78 feet, 4.5 inches beyond the seawall.

This work site is located in the Boston Inner Harbor at 28-52 Northern Avenue in South Boston.

[mappress]

Press Release, November 13, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago