Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›ADBP to Present “Maximising Return from Sub Sea Assets“
News

November 14, 2013 · about 12 years ago

ADBP to Present “Maximising Return from Sub Sea Assets“

Anthony D Bates Partnership LLP (ADBP) has announced that they will make a presentation at the 9th International Conference on Ports and Terminal Technology being held in Amsterdam on the 27th November 2013. This presentation investigates the following aspects with regard to maximising cargos and th

2 minutes read
  • LinkedIn
  • X
  • Email

Anthony D Bates Partnership LLP (ADBP) has announced that they will make a presentation at the 9th International Conference on Ports and Terminal Technology being held in Amsterdam on the 27th November 2013.

This presentation investigates the following aspects with regard to maximising cargos and the cost benefits associated with each:

– Review of current and future vessel size in relation to berth pocket design and channel definition to maximise cargoes

There have been significant changes in vessel design over the years but very rarely is a review carried out to see if the existing subsea facility actually corresponds to the specific parameters of the port’s trade vessels. Undertaking a review process can potentially elongate the durations between dredging campaigns, reducing maintenance costs while not impacting on safety.

– Regular, accurate and reliable bathymetric survey information

The cost of hydrographic surveys is often seen as an unnecessary expense, yet the information gathered can easily pay significant dividends if used in an appropriate manner.

The potential risk associated with safe navigation can also be minimised.

– Forward prediction of dredging requirements and associated budget provision

By utilising reliable survey information, in the correct manner, accurate sedimentation rates can be generated and modelled to predict the optimum time for dredging. By establishing the volume of material to be removed a reliable budget estimate can be set 1, 2, 3 years in advance and potentially allow collaboration with other local projects to reduce costs.

[mappress]

Press Release, November 14, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago