Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kuwait: Subiya Dredging Project Underway
Business & Finance

November 17, 2013 · about 12 years ago

Kuwait: Subiya Dredging Project Underway

The first hydraulic reclamation operation of Kuwait Subiya Dredging Project is currently underway. “Huatailong” cutter suction dredger travelled to and fro between the construction area and the hydraulic reclamation area. The equipment ran smoothly, achieving a good result. The designed length of te

1 minutes read
  • LinkedIn
  • X
  • Email

The first hydraulic reclamation operation of Kuwait Subiya Dredging Project is currently underway.

“Huatailong” cutter suction dredger travelled to and fro between the construction area and the hydraulic reclamation area. The equipment ran smoothly, achieving a good result.

The designed length of temporary channel of this project is 7700m; the bottom is 163m wide; the excavation amount is about 5,300,000m3; the planned project duration is 4 months. The sub-contractor CCCC Guangzhou Dredging Co., Ltd. dispatched the full-intelligent “Huatailong” vessel which was imported from the Netherlands to work. This vessel can conduct dredging operation even when the hull is moving, which guarantees the smooth implementation of the project.

The success of the first hydraulic reclamation operation marks that the project implementation has entered a substantial stage. It is widely acclaimed by the owner and the industry of Kuwait, presents a good enterprise management appearance and also lays a foundation for the follow-up market development.

[mappress]

Press Release, November 18, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago