Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Pine Creek Dredging Plan Gets Green Light (USA)
News

November 21, 2013 · about 12 years ago

Pine Creek Dredging Plan Gets Green Light (USA)

First Selectman Mike Tetreau announced that the Town has received a Certificate of Permission from the State of Connecticut to begin dredging Pine Creek. The project will be performed by Coastline Consultants, a contractor which is located in Madison Connecticut. The contractor should begin the proj

1 minutes read
  • LinkedIn
  • X
  • Email

First Selectman Mike Tetreau announced that the Town has received a Certificate of Permission from the State of Connecticut to begin dredging Pine Creek.

The project will be performed by Coastline Consultants, a contractor which is located in Madison Connecticut.

The contractor should begin the project before the end of November with some preparation work possibly beginning the week of November 25, 2013.

Actual dredging will occur about a week or two after initial preparation work begins.

The dredging will occur for about four to six weeks depending on weather and favorable tides.

The dredging project is being performed to remove sand that accumulated in Pine Creek during Storm Sandy.

The Creek will be dredged approximately two feet from the mouth of the creek to an area of current “sand bars”, which is approximately 1200 feet.

The dredge rig includes a 30’ x 40’ barge and a CAT 312 excavator with ¾ cubic yard bucket.

Prior to dredging in the area, the contractor will let the Town and property owners know if vessels or temporary structures have to be moved for access to dredge.

There will be a section of the Fairfield Beach Road turnaround located adjacent to 2182 Fairfield Beach Road that may be narrowed for transport of removed sand.

About half of the turnaround could be closed or narrowed.

[mappress]

Press Release, November 21, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago