Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Corps Seeks Public Comments for Seven Levees Report
Business & Finance

November 24, 2013 · about 12 years ago

USA: Corps Seeks Public Comments for Seven Levees Report

The U.S. Army Corps of Engineers Kansas City District has studied flood risk management and reliability improvements for the seven levee units in the Kansas City metropolitan area and is seeking review and public comment on the information presented within the Draft Final Feasibility Report (DFFR).

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers Kansas City District has studied flood risk management and reliability improvements for the seven levee units in the Kansas City metropolitan area and is seeking review and public comment on the information presented within the Draft Final Feasibility Report (DFFR).

The study was conducted at the request and with cooperation of the sponsors of the seven levee units under the authority of Section 216 of the 1970 Flood Control Act. Any comments received will be considered by the Corps of Engineers to determine whether to modify the recommendations within the report.

The purpose of the overall study of the seven levee units was to determine whether one or more plans for improvements to the existing levee system to reduce flood risk and improve levee reliability is technically viable, economically feasible, and environmentally acceptable, or if no action is warranted. Failure of any part of the existing flood risk management system during a major flood would have significant adverse impacts on the human environment including property damage and potential loss of human life.

The recommendations for the reliability improvements in the Armourdale and Central Industrial District (CID) units are addressed and available for review in the DFFR, which presents the completed feasibility analysis of alternatives for the Armourdale and CID levee units.

Proposed alternatives identified to improve flood risk management system reliability include, but are not limited to earthen levee raise, pump station modifications, floodwall replacement, stoplog and sandbag closures, pressure relief wells, floodwall modification using buttresses, and the no action alternative. DFFR analysis concluded that the nominal 500-year+3ft projected water surface elevation levee raise and underseepage improvements is the preferred alternative for both the Armourdale and CID units.

More info

[mappress]

Press Release, November 25, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago