Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Australia: Water Minister Inspects River System Erosion Hot Spots
News

December 6, 2013 · about 12 years ago

Australia: Water Minister Inspects River System Erosion Hot Spots

Minister for Energy and Water Supply Mark McArdle has undertaken an aerial inspection of the Lockyer Creek and mid-Brisbane river systems ahead of the upcoming wet season. Mr McArdle said following significant rain in South East Queensland at the beginning of the year sediment from the Lockyer catch

2 minutes read
  • LinkedIn
  • X
  • Email

Minister for Energy and Water Supply Mark McArdle has undertaken an aerial inspection of the Lockyer Creek and mid-Brisbane river systems ahead of the upcoming wet season.

Mr McArdle said following significant rain in South East Queensland at the beginning of the year sediment from the Lockyer catchment caused major problems at Mr Crosby Water Treatment Plant.

“ It is important to see first-hand the condition of Brisbane’s water supply catchment, ” Mr McArdle said.

“ The build up of sediment earlier this year temporarily closed the major water treatment plant for Brisbane City, the Mt Crosby treatment plant.

“ Since then, Seqwater and Queensland Urban Utilities which distributes water from its reservoirs, have undertaken planning to improve operations as well as their response, if a similar event were to occur.

“ However, the condition of the catchments still remains a concern. ”

Seqwater Acting CEO Peter Dennis said catchment condition was key to improving raw water quality in the region’s dams and rivers and ultimately protecting our drinking water supply.

“ The state of our catchments has a major impact on the quality of water we are required to treat at Mt Crosby. Understanding the challenges we face is the first step in developing a whole of catchment solution ,’’ Mr Dennis said.

“ A rehabilitated catchment over the longer term will be the most cost effective option to protect drinking water .’’

Australian Rivers Institute Deputy Director Professor Jon Olley said the problems could be fixed.

“ We have known how to fix this issue for more than a decade and this visit enabled the Minister to assess what is required ,” he said.

“ Multiple studies have shown that the primary issue is the poor condition of the channel – most of it has been cleared of trees over the last 100 years and this clearing has destabilised the channel network.

“ Improving the condition of the channel network will not only ensure Brisbane’s water supply but also provide protection for Moreton Bay the ultimate recipient of the sediment .”

[mappress]

Press Release, December 6, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago