Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Kongsberg Delivers First Set of CAMDS to University of Washington (USA)
News

December 10, 2013 · about 12 years ago

Kongsberg Delivers First Set of CAMDS to University of Washington (USA)

The Kongsberg Maritime Ltd Camera group Systems & Projects Team has successfully delivered the first set of cabled IP Digital Still Camera Stations (CAMDS) to the University of Washington. The delivery is for the regional cabled observatory component of the Ocean Observatories Initiative (OOI) progr

2 minutes read
  • LinkedIn
  • X
  • Email

The Kongsberg Maritime Ltd Camera group Systems & Projects Team has successfully delivered the first set of cabled IP Digital Still Camera Stations (CAMDS) to the University of Washington.

The delivery is for the regional cabled observatory component of the Ocean Observatories Initiative (OOI) programme in the northeast Pacific Ocean off the West Coast of the United States of America. Further cabled systems are scheduled for delivery in the coming months to Oregon State University as part of the coastal Endurance Array component of the OOI programme. The OOI is funded by the U.S. National Science Foundation.

Designed for real-time imaging via the cabled observatory’s Internet connection, the regional CAMDS systems will be deployed as part of the OOI at methane seep and hydrothermal vent sites deep in the ocean where they will remain for one year. They will capture images of the evolving vents and the bacterial and animal life that grows around them. The coastal Endurance CAMDS systems will be deployed on the seafloor in cabled benthic packages on the continental slope and shelf off the coast of Oregon, to image the sediment surface in sufficient detail to identify swimming and crawling organisms, observe changes in physical bedforms, and detect tracks and trails made by mobile fauna.

Each system consists of a High Definition Digital Stills Camera mounted onto a Pan & Tilt Unit. Also included are LED Lamps, a Dual Laser Reference Unit, Junction Box & frame work. All components including the connectors are made of titanium so the unit can be deployed at a depth of up to 3000 metres for up to a year without maintenance.

The system can be fully controlled over Ethernet and is capable of live streaming images as well as storing them locally on board the camera or over network drives. The lasers are provided to allow measurement reference and will appear in the camera field of view. Warm white LED lamps are separated by a 1m frame to reduce backscatter. The whole payload is mounted on a P&T unit so the user can point the camera at desired targets, and a subsea junction box for power control is attached directly to the P&T unit to simplify mounting and operation.

[mappress]

Press Release, December 10, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago