Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Gosnold Seeks Permit to Excavate Tidal Openings to Buzzards Bay
Business & Finance

December 10, 2013 · about 12 years ago

USA: Gosnold Seeks Permit to Excavate Tidal Openings to Buzzards Bay

The Town of Gosnold is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the United States in conjunction with excavating to create tidal openings to Buzzards Bay to reintroduce tidal flushing into Westend Pond and Central Pond on Cuttyhunk Is

2 minutes read
  • LinkedIn
  • X
  • Email

The Town of Gosnold is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the United States in conjunction with excavating to create tidal openings to Buzzards Bay to reintroduce tidal flushing into Westend Pond and Central Pond on Cuttyhunk Island in Gosnold, Mass.

The Town of Gosnold Board of Selectmen is proposing to excavate an opening between the Westend Pond on Cuttyhunk Island and Buzzards Bay and to excavate a tidal opening between Westend Pond and Central Pond. This proposed work is to re-establish the tidal connection between the Westend Pond and Buzzards Bay. The Corps has issued two previous approvals to excavate to connect the waters of Westend Pond to Buzzards Bay but the excavations previously authorized have now filled in naturally.

This proposed permit is to allow the Town to attempt to re-establish a new opening and to dredge it annually or as needed to maintain the connection. The excavated material will be placed on nearby upland areas above the high tide line.

The proposed new connection between Buzzards Bay and Westend Pond is 20 feet in width and approximately 170 feet long and will be excavated down to the elevation of mean low water. The estimated volume of material to be excavated is approximately 1,200 cubic yards of gravel and cobbles. The connection between Westend Pond and Central Pond is approximately 237 feet in length, 20 feet wide and also will be excavated down to mean low water. Approximately 950 cubic yards of material will be removed and placed in the nearby uplands.

The work being proposed is to enhance the water quality of these ponds by reintroducing tidal flushing and making the ponds more suitable for salt tolerant aquatic species. The dredged material disposal is proposed for upland areas on the nearby barrier beaches separating the ponds from Buzzards Bay.

The dredging portion of this project will impact approximately 9,140 square feet of Essential Fish Habitat (EFH) for various species and life stages. It also will reintroduce tidal flushing into these two coastal pond systems. Habitat at this site can be described as a cobbles-and-gravel barrier beach. Due to the creation of new intertidal habitat and the introduction of salt water into these ponds, the Corps has made a preliminary determination that the site specific adverse effect will not be substantial. Further consultation with the National Marine Fisheries Service regarding EFH conservation recommendations is being conducted and will be concluded prior to the final permit decision.

No adverse impacts to any EFH species will occur as a result of the dredged material disposal.

[mappress]

Press Release, December 11, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago