Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›APM Terminals Signs Abidjan Terminal 2 Project (Ivory Coast)
News

December 20, 2013 · about 12 years ago

APM Terminals Signs Abidjan Terminal 2 Project (Ivory Coast)

The APM Terminals-led consortium formally signed the agreement with the Government of the Ivory Coast on December 19, 2013 for the construction and operation of a new terminal at the Port of Abidjan. Known as TC2, the terminal will be the second in operation at the port, which handled approximately

2 minutes read
  • LinkedIn
  • X
  • Email

The APM Terminals-led consortium formally signed the agreement with the Government of the Ivory Coast on December 19, 2013 for the construction and operation of a new terminal at the Port of Abidjan.

Known as TC2, the terminal will be the second in operation at the port, which handled approximately 600,000 TEUs in 2012, making it one of the busiest container ports in West Africa. The new facility will offer 1,100 meters of quay with a depth alongside of 18 meters, able to accommodate vessels of up to 350 meters in length.

The project consortium is comprised of APM Terminals, Bolloré Africa Logistics and French-based construction firm Bouygues TP.

“ There is a crucial need for port infrastructure here in West Africa and across the emerging markets to handle larger vessels and this is why we are making this investment as a commitment to Africa’s future ” stated APM Terminals Head of the company’s Africa-Middle East Region, Peder Sondergaard.

The government of the Ivory Coast will be responsible for the construction and financing of the preliminary basic infrastructure, including dredging, canal expansion, land reclamation and the quay wall, at a cost estimated between USD 500 and USD 800 million. APM Terminals and its partners will design the new terminal to the specifications and the latest operational standards of the APM Terminals Global Terminal Network. The TC2 facility will be equipped with 26 RTGs and nine STS cranes at full build-out, with an annual throughput capacity of 2.1 million TEUs and a 37.5 hectare (86 acre) yard.

The APM Terminals consortium plans to spend a total of CFA 300 billion (USD 600 million) over the 21-year concession term, including more than USD 400 million in the first five years (2013-2017). The terminal is scheduled to begin operations by early 2018.

[mappress]

Press Release, December 20, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago