Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Corps Seeks Public Comment on 2015 Tybee Beach Renourishment Plans (USA)
News

December 20, 2013 · about 12 years ago

Corps Seeks Public Comment on 2015 Tybee Beach Renourishment Plans (USA)

The U.S. Army Corps of Engineers, Savannah District announces the availability of a Draft Environmental Assessment (EA) and Draft Finding of No Significant Impact (FONSI) for the proposed 2015 Tybee beach renourishment project. The Draft EA and FONSI evaluate the environmental impacts of the propose

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Savannah District announces the availability of a Draft Environmental Assessment (EA) and Draft Finding of No Significant Impact (FONSI) for the proposed 2015 Tybee beach renourishment project.

The Draft EA and FONSI evaluate the environmental impacts of the proposed beach renourishment for the Tybee Island Shore Protection Project on Tybee Island, Ga. The EA is the primary tool that the Corps uses to determine whether or not to prepare an Environmental Impact Statement. Additionally, as determined by the findings of the draft EA, a draft FONSI is also available for public review.

The proposed project would be cost shared with the City of Tybee Island.

This 3.5 mile long project was initially constructed in 1974 with a 50-year project life, with periodic renourishments to occur every 7 years. The beach was last renourished in 2008. The proposed project would occur between November 2015 and April 2016. The activity would be very similar to what was performed during previous renourishments. Similar techniques and equipment would be used, as well as enhanced measures for public safety.

The process involves using a cutterhead dredge to move about 1.7 million cubic yards of high quality sand from an area located 1.5 miles from the southern tip of Tybee Island. The deposited sand would be enough to compensate for the erosion expected to occur over the next nine years. The project will include placing sand up to the north terminal groin. This northern area was included in previous renourishment cycles, but not the 2008 renourishment.

[mappress]

Press Release, December 20, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago