Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Contaminated Soil Prompts Interim Work at Blaine Cleanup Site
Business & Finance

January 9, 2014 · about 12 years ago

USA: Contaminated Soil Prompts Interim Work at Blaine Cleanup Site

During a routine environmental investigation of a cleanup site in Blaine, crews found contaminated soil within the footprint of a new building that was under construction in the Blaine Harbor industrial area. The Port of Bellingham and Washington Department of Ecology (Ecology) removed approximately

2 minutes read
  • LinkedIn
  • X
  • Email

During a routine environmental investigation of a cleanup site in Blaine, crews found contaminated soil within the footprint of a new building that was under construction in the Blaine Harbor industrial area.

The Port of Bellingham and Washington Department of Ecology (Ecology) removed approximately 230 cubic yards of contaminated soil from the construction site. The soil is contaminated with low levels of metals and hydrocarbons. The soil is stockpiled nearby while arrangements are made to properly dispose of it.

Crews have been investigating the area known as the Westman Marine cleanup site for contamination left behind from previous boat and shipyard work dating back to the 1940s.

The investigation is part of a larger effort by the Port and Ecology to determine the extent of historic contamination, design a cleanup project, and restore the site.

The approximately 1.5-acre site is located near the end of Marine Drive, off of McMillan Avenue. It includes land in and out of the water. And the new building under construction extended into the cleanup site.

While removing the contaminated soil in October 2013, crews also discovered remnants of a work area from a past boatyard, including a buried concrete vault. The soil beneath the vault was contaminated with diesel. Both the vault and contaminated soil were removed.

Rather than wait for the final site-wide cleanup work a few years from now, the Port of Bellingham has proposed an interim project to safely remove and properly dispose of the contaminated soil now.

Ecology invites the public to review and comment on the proposed interim project any time between Jan. 13 and Feb. 12, 2014.

[mappress]

Press Release, January 10, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago