Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Port of Dover: New Rock Groynes to Provide Beach Protection (UK)
News

February 6, 2014 · about 12 years ago

Port of Dover: New Rock Groynes to Provide Beach Protection (UK)

Having withstood the elements for many years, the seafront groynes are to be replaced and upgraded with the highest quality of rock groynes in order to provide the best beach protection and frontage for Dover’s community. The current groynes are reaching the end of their life and the Port of Dover w

2 minutes read
  • LinkedIn
  • X
  • Email

Having withstood the elements for many years, the seafront groynes are to be replaced and upgraded with the highest quality of rock groynes in order to provide the best beach protection and frontage for Dover’s community.

The current groynes are reaching the end of their life and the Port of Dover wants to ensure that they are replaced with the very best to support the wider waterfront regeneration agenda being pursued for Dover.

From 24th February, work will commence to replace the existing groynes with new rock groynes made of Larvic rock from Norway, one of the most durable types of rock, that will both defend and protect the beach but also create a much more visually appealing beach environment.

Part of the promenade sea wall will also be repaired at the same time.

Jack Goodhew, General Manager – Technical Services, Port of Dover , said: “ We were determined to combine our desire to preserve and enhance the beach for the long term with our wider vision of a quality waterfront that is part of reviving Dover as a destination .”

Access to parts of the beach will be limited as the work progresses in order to ensure the safety of everyone.

The Port is currently engaging with all those who live or work on the seafront and interested local organisations on the project in order that they are fully informed about the works.

Mr Goodhew added: “We are starting the work this month in order that it is completed for the Summer season. The beach is valued greatly by our local community and we want to ensure that it is ready for when the summer holidays begin. ”

[mappress]

Press Release, February 6, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago