Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›NuStar Completes Construction of Marine Loading Dock in Corpus Christi (USA)
News

February 14, 2014 · about 12 years ago

NuStar Completes Construction of Marine Loading Dock in Corpus Christi (USA)

NuStar Energy L.P. announced that the company has completed construction of a private marine loading dock at its North Beach Terminal in Corpus Christi, Texas, and has its first ship at the dock to be loaded with crude oil. Originally scheduled to be completed in the second quarter of this year, NuS

2 minutes read
  • LinkedIn
  • X
  • Email

NuStar Energy L.P. announced that the company has completed construction of a private marine loading dock at its North Beach Terminal in Corpus Christi, Texas, and has its first ship at the dock to be loaded with crude oil.

Originally scheduled to be completed in the second quarter of this year, NuStar expedited the project in order to meet strong customer interest in using the dock to transport shipments of Eagle Ford crude oil by water.

With this new dock, NuStar now has three loading docks in the Port of Corpus Christi, and can load crude oil onto ships simultaneously on all three docks.

NuStar also completed major additions and upgrades to the terminal’s pump systems.

With all of these upgrades, the North Beach terminal’s marine loading capacity was more than tripled to 400,000 barrels per day.

“ The addition of the new dock and the related upgrades to our systems are critical to our Eagle Ford Shale strategy as it gives our customers even more options to move Eagle Ford crude by water ,” said NuStar President and CEO Brad Barron.

“ This additional capacity enables us to handle all of the new volumes associated with our ongoing expansion efforts in our South Texas crude oil pipeline system, as well as additional volumes shipped on our pipeline systems to Corpus Christi .

“ And finishing this project several months ahead of schedule is a real testament to the hard work and dedication of our employees and our contractors ,” Barron added. “ I’m proud of the great teamwork they showed in working together not just to finish the project quickly, but to finish it safely.”

The new dock project includes a series of 30-inch and 12-inch pipelines that move the crude oil from incoming pipelines or tanks within the terminal to the new dock, a state-of-the-art metering system, vapor control system, and a dock structure with three loading arms.

The dock system is designed to load Panamax-class vessels (which carry between 350,000 and 500,000 barrels) at rates up to 30,000 barrels per hour. And the entire structure is supported by 73 concrete piles, each measuring approximately 120 feet, and each of these piles was driven about 70 feet into the bottom of the ship channel.

[mappress]

Press Release, February 14, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago