Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Comment Period on Dredging of FNP Extended (USA)
News

February 28, 2014 · about 12 years ago

Comment Period on Dredging of FNP Extended (USA)

The U.S. Army Corps of Engineers, New England District, is extending the comment period until March 28, 2014 on the proposed maintenance dredging of the Mystic River Federal Navigation Project (FNP) in Groton and Stonington, Conn. This will allow people more time to comment. The state of Connecticut

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is extending the comment period until March 28, 2014 on the proposed maintenance dredging of the Mystic River Federal Navigation Project (FNP) in Groton and Stonington, Conn.

This will allow people more time to comment.

The state of Connecticut is the local sponsor for this proposed work and the state is funding this dredging project.

Mystic River is located in southeastern Connecticut in New London County, on Fishers Island Sound, the eastern arm of Long Island Sound. The harbor forms the boundary between the towns of Stonington and Groton. The authorized Federal navigation project consists of a 15-foot channel, 125 feet from the Sound up to the railroad bridge, then 100 feet wide up to the highway bridge (U.S. Route 1); a 12-foot channel above the highway bridge to the upper wharves at the Seaport Museum; a 9-foot by 8.5-acre anchorage in the harbor north of Mason Island; and a 9-foot turning basin above the railroad bridge.

The 12-foot channel was last maintained in 1941. Dredging of the other project features was last accomplished with the improvement work in 1957. “ Approximately 250,000 cubic yards of predominantly silt will be dredged from the Federal navigation project ,” said Project Manager Jennifer Flanagan , of the Corps’ New England District, Programs/Project Management Division in Concord, Mass. “ The dredging would restore the channels and anchorage area to authorized depths. ”

A mechanical dredge using various types of clamshell buckets would remove material from the shoaled portions of the Mystic Federal navigation project and place it into scows that would be towed to either the New London Disposal Site in Long Island Sound or the Rhode Island Sound Disposal Site in Rhode Island Sound for disposal. Dredging and disposal operations are anticipated to take five to seven months to complete during the period from Sept. 1 through April 1 of the year that funding becomes available. A draft Environmental Assessment for this proposed work has been prepared and is available for review.

Coordination includes U.S. Environmental Protection Agency; U.S. Fish and Wildlife Service; National Marine Fisheries Service; Connecticut Department of Energy and Environmental Protection, Office of Long Island Sound Programs; Connecticut Historical Commission; Connecticut Department of Agriculture/Aquaculture; Mystic Harbor Management Commission; Groton town engineer; and Mystic Harbor Port Authority.

[mappress]

Press Release, February 28, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago