O n February 28, 2014 , IHC Global Production B.V, part of IHC Merwede, and Uljanik d.d. signed the contract for the construction of one self-propelled cutter suction dredger .
The installed power of the vessel will correspond to 23,684 kW, the length of the vessel will be 152 m and the width 28 m.
The delivery of the vessel is scheduled for April 2016 and same will be constructed in Uljanik Brodogradilište d.d.
[mappress]
March 4, 2014