Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Norway: New Crane to Arrive at Port of Larvick
News

March 13, 2014 · about 12 years ago

Norway: New Crane to Arrive at Port of Larvick

An outsize load left the port of Antwerp yesterday morning on its way to Norway. A container crane with a height of 69 metres was loaded on board a pontoon in the Delwaide dock. The crane was transported with a bascule laid horizontally, giving the convoy the extraordinary dimensions of 145 metres l

1 minutes read
  • LinkedIn
  • X
  • Email

An outsize load left the port of Antwerp yesterday morning on its way to Norway.

A container crane with a height of 69 metres was loaded on board a pontoon in the Delwaide dock.

The crane was transported with a bascule laid horizontally, giving the convoy the extraordinary dimensions of 145 metres long and 89 metres wide.

The load passed through the Berendrecht lock, the largest in the world, in the early hours of the morning.

The crane will arrive in the course of the following week in the Norwegian port of Larvick where it will serve a container terminal.

[mappress]

Press Release, March 14, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago