Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›CCCC Second Harbor Engineering Bags Deal for Mengjiagang Terminal (China)
News

March 30, 2014 · about 12 years ago

CCCC Second Harbor Engineering Bags Deal for Mengjiagang Terminal (China)

CCCC Second Harbor Engineering Co., Ltd. has recently won the bid for Mengjiagang terminal project in Zhenjiang City, Jiangsu Province with a contract construction period of 12 months. In high-piled beam & slab structure, the terminal is designed to berth 70,000t bulk carriers; the project involves

1 minutes read
  • LinkedIn
  • X
  • Email

CCCC Second Harbor Engineering Co., Ltd. has recently won the bid for Mengjiagang terminal project in Zhenjiang City, Jiangsu Province with a contract construction period of 12 months.

In high-piled beam & slab structure, the terminal is designed to berth 70,000t bulk carriers; the project involves three 50,000t berths, an approach and a substation platform.

The project is of great significance to improving the transportation capacity of Zhenjiang Port, building Zhenjiang into a logistics trade center in the lower reaches of the Yangtze River and promoting regional economic development.

[mappress]

Press Release, March 31, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago