Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Corps Invites Public Input on Columbia River Dredging
Business & Finance

April 5, 2014 · about 12 years ago

USA: Corps Invites Public Input on Columbia River Dredging

The U.S. Army Corps of Engineers is seeking comments on the draft environmental assessment for the Columbia River Federal Navigation Channel Operations and Maintenance Dredging and Dredged Material Placement Network Update, River Mile 3 to 106.5. The Corps is proposing to continue operation and main

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers is seeking comments on the draft environmental assessment for the Columbia River Federal Navigation Channel Operations and Maintenance Dredging and Dredged Material Placement Network Update, River Mile 3 to 106.5.

The Corps is proposing to continue operation and maintenance of the Columbia River Federal Navigation Channel and update the dredged material placement network in the mentioned area.

In 2003, the Corps identified 29 sites suitable for 20 years of dredged material placement use after construction of the 43-foot deep-draft navigation channel.

Since the completion of the deepened channel in 2010, some sites in the network have reached capacity or are nearing site capacity beyond what was evaluated by the Corps in 2003. Additionally, several upland dredged material placement sites have been removed from the list of available dredged material placement sites.

Reconfiguring the existing network with updated volume capacity, the use of a new in-water sump, and the addition of shoreline placement to an existing upland dredged material placement site will allow the Corps to improve strategic management of dredged material placement.

The updated network will allow for greater flexibility for maintaining the navigation channel.

[mappress]

Press Release, April 6, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

15 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

15 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

15 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

15 days ago