Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Jetty Replaced at Batavia Coast Marina
Business & Finance

May 12, 2014 · about 12 years ago

Australia: Jetty Replaced at Batavia Coast Marina

Work is complete on the $2.1 million replacement of Jetty A at Geraldton’s Batavia Coast Marina. Transport Minister Dean Nalder said the brand new modern floating pen system was vastly superior to the original concrete and wood structure which had reached the end of its serviceable life. “The new Je

1 minutes read
  • LinkedIn
  • X
  • Email

Work is complete on the $2.1 million replacement of Jetty A at Geraldton’s Batavia Coast Marina.

Transport Minister Dean Nalder said the brand new modern floating pen system was vastly superior to the original concrete and wood structure which had reached the end of its serviceable life.

“ The new Jetty A requires minimal maintenance and can accommodate 42 vessels,” Mr Nalder said.

“Pens range in length from 10 to 18m and include two pens for catamarans up to 18m in length. Jetty walkways are now wider and the marina has enhanced fire and security systems.”

Additionally, all of the new pens have a finger jetty extending the entire length of the pen to assist loading, unloading and general access.

Work on the replacement project was undertaken by Walcon Marine Australia Pty Ltd, which had previously completed the installation of floating pens at the Albany Waterfront Marina.

“The project followed a major expansion in pen facilities at the marina with the construction of Jetty B in 2011 which added 42 pens, ” the Minister said.

“The Batavia Coast Marina is already highly sought-after because of the high quality of the pen infrastructure and this will be further enhanced by the replacement of Jetty A.”

[mappress]

Press Release, May 12, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

1 day ago

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

1 day ago
PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

1 day ago