Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Corps Proposes Stone Revetment to Reduce Hull Coastal Damage
Business & Finance

May 13, 2014 · about 12 years ago

USA: Corps Proposes Stone Revetment to Reduce Hull Coastal Damage

The U.S. Army Corps of Engineers, New England District, has conducted a feasibility investigation to examine coastal storm damage reduction alternatives for the Department of Conservation and Recreation (DCR) Reservation at Nantasket Beach in Hull, Massachusetts. The Corps’ proposed recommended plan

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, has conducted a feasibility investigation to examine coastal storm damage reduction alternatives for the Department of Conservation and Recreation (DCR) Reservation at Nantasket Beach in Hull, Massachusetts. The Corps’ proposed recommended plan is to build a 2,100-foot stone revetment to reduce coastal storm damage.

“The study for a coastal storm damage reduction project was conducted to examine solutions to storm damage and flooding at the Nantasket Beach DCR Reservation and backshore properties in the town of Hull, ” said Study Manager David Larsen, of the Corps’ New England District Engineering/Planning Division in Concord, Mass. “ During coastal storms, these properties can sustain damages from wind and wave action.”

The study has been completed to identify and evaluate alternative plans that would reduce or eliminate these damages. Storm waves and winds pose a potential flood hazard to the DCR facilities and commercial properties in the backshore. The project would provide protection for the sea wall and reduce the risk of flooding in this area.

The proposed project for the Nantasket Beach DCR Reservation would provide protection along about 2,100 feet of shoreline along Nantasket Beach through the construction of a stone revetment on the shore side of the sea wall from a point in the vicinity of the intersection of Nantasket Avenue and Wharf Avenue to a point in the vicinity of the intersection of Hull Shore Drive and Water Street.

The recommended Federal project is construction of a 2,100-foot long stone revetment seaward of the sea wall, with an 8-foot wide bench at elevation 12 feet National Geodetic Vertical Datum (NGVD), sloping to the existing beach at a maximum slope of 1 foot on vertical to 3 feet horizontal.

[mappress]

Press Release, May 14, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

1 day ago

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

1 day ago
PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

1 day ago