Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Burnett River Dredging Wrapped Up
Business & Finance

May 26, 2014 · about 12 years ago

Australia: Burnett River Dredging Wrapped Up

Neumann Contractors have recently completed dredging works in Queensland’s Burnett River near Kirby’s Wall. The job involved deepening the navigational channel and placement of the material behind “Kirby’s Wall”. Neumann performed the work using their 450mm cutter suction dredger Nu Endeavour couple

1 minutes read
  • LinkedIn
  • X
  • Email

Neumann Contractors have recently completed dredging works in Queensland’s Burnett River near Kirby’s Wall. The job involved deepening the navigational channel and placement of the material behind “Kirby’s Wall”.

Neumann performed the work using their 450mm cutter suction dredger Nu Endeavour coupled to a spreader barge for placement.

The work was required following recent severe flooding, with joint funding provided by the Qld Department of Transport and Main Roads and the Department of Natural Resources and Mines.

The Burnett River was severely impacted by flooding in January 2013. Dredging was required to restore the depth of the river’s navigational channels adjacent to Kirby’s Wall. A total of 65,700 cubic metres of sand and gravel was removed from the channels and placed behind Kirby’s Wall.

Two specific dredge areas were nominated by TMR:

– Dredge Area A, adjacent and upstream of Kirby’s Wall required 36,000m3 of material to be removed;

– Dredge Area B, downstream of Kirby’s Wall with almost 30,000m3.

Both dredge areas were required to be dredge to a maximum depth of 2.3m below LAT. The dredged material was required to be placed behind Kirby’s Wall to fill in the area between the river bank and the rock wall.

[mappress]

Press Release, May 27, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

1 day ago

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

2 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

1 day ago
PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

2 days ago