Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Corps to Further Develop LA River Ecosystem Restoration Study
Business & Finance

May 29, 2014 · about 12 years ago

USA: Corps to Further Develop LA River Ecosystem Restoration Study

The U.S. Army Corps of Engineers received guidance from Assistant Secretary of the Army for Civil Works Jo-Ellen Darcy May 27 on moving forward with further development of the Los Angeles River Ecosystem Restoration Study and future documentation. Based on information presented by USACE, as well as

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers received guidance from Assistant Secretary of the Army for Civil Works Jo-Ellen Darcy May 27 on moving forward with further development of the Los Angeles River Ecosystem Restoration Study and future documentation.

Based on information presented by USACE, as well as consideration of the correlation of the project with key administration initiatives (including the Climate Action Plan, America’s Great Outdoors initiative, and the Urban Waters Federal Partnership), Darcy concluded, “There is substantial federal interest in the LPP (Locally Preferred Plan)” known as Alternative 20 and requested by the Mayor of Los Angeles Eric Garcetti.

Darcy also directed USACE to consider recommending the federal government cost share the project equally with the local cost share sponsor, the City of Los Angeles.

The direction further clarified that all other provisions of policy must be met to include incorporating relevant information “into the final decision documents and subject to the non-federal sponsor’s continued agreement to forgo reimbursement or credit for real estate, which may exceed 35 percent of the LPP cost. All other requirements of local cooperation remain the same, including the non-federal sponsor’s requirement to operate, maintain, repair, replace, and rehabilitate (OMRR&R) the project after construction in accordance with Section 103(j) of the Water Resources Development Act of 1986. ”

“The Corps of Engineers and the Los Angeles District look forward to continuing to collaborate with Mayor Garcetti, the City of Los Angeles, and all local stakeholders and partners to advance this study to a Civil Works Review Board, which we hope to complete by the end of this year,” said Col. Kim Colloton, USACE Los Angeles District commander.

Once USACE completes its policy compliance review at the Civil Works Review Board, the study will be submitted for final state and agency review. Usually within three months, the USACE Chief of Engineers will review the study, and forward his recommendation in a Chief’s Report to the administration and Congress. At this point, the study will be reviewed by policy makers for decisions related to cost share provisions, authorization to move forward into design and construction, and eventual appropriation. Any provisions different from normal statutory provisions and policy standards would need to be specifically indicated in authorizing legislation.

USACE; May 30, 2014; Image: USACE

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

29 days ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

29 days ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago