Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Germany: IDRECO Delivers ISD300 Dredger to Rohr Sand und Kies
Business & Finance

June 11, 2014 · about 12 years ago

Germany: IDRECO Delivers ISD300 Dredger to Rohr Sand und Kies

Rohr Sand und Kies, based in Waldsee near Speyer in Germany, received their second fully electric driven ISD300 from IDRECO BV. Two years ago Rohr bought their first deep dredger from IDRECO for their plant in Bensheim. After one year of working with the new IDRECO deep suction dredger, the decision

2 minutes read
  • LinkedIn
  • X
  • Email

Rohr Sand und Kies, based in Waldsee near Speyer in Germany, received their second fully electric driven ISD300 from IDRECO BV.

Two years ago Rohr bought their first deep dredger from IDRECO for their plant in Bensheim. After one year of working with the new IDRECO deep suction dredger, the decision was made to also replace the existing bucket ladder dredger at the plant in Waldsee.

One of the reasons was deeper dredging, but also the higher efficiency of mining with a suction dredger of IDRECO. This made them decide to purchase a second dredge within two years.

This IDRECO ISD300 dredger is equal to Rohr’s first dredger and is equipped with an underwater IDP300 dredge pump. This is directly driven by a submersible electric motor with a power of 315 kw and frequency driven. A jet water pump with a capacity of 250 m3 at 9 bar pressure is placed inside the starboard pontoon and feeds the 8 jet nozzles on the jet suction head.

The maximum suction depth of the dredger is 32 meter below water level and it has a production output of 300 tons material per hour.

Installation of the IDRECO Dredger Control System guaranties maximum efficiency in dredging and means maximum production with as less energy use as possible. A DGPS system is also installed on the dredger to monitor the mining volume and depth which makes it possible to mine the maximum amount of cubic meters out of the licenced plot.

[mappress]

Press Release, June 11, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago