Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Tappan Zee Project: Governor Announces USD 500 Million in EFC Loans
Business & Finance

June 16, 2014 · about 12 years ago

Tappan Zee Project: Governor Announces USD 500 Million in EFC Loans

Governor Andrew M. Cuomo said yesterday that the New York State Environmental Facilities Corporation (EFC) will make up to $511.45 million in low-cost loans to the New York State Thruway Authority for environmental protection and Hudson River restoration projects related to the New NY Bridge project

2 minutes read
  • LinkedIn
  • X
  • Email

Governor Andrew M. Cuomo said yesterday that the New York State Environmental Facilities Corporation (EFC) will make up to $511.45 million in low-cost loans to the New York State Thruway Authority for environmental protection and Hudson River restoration projects related to the New NY Bridge project to replace the Tappan Zee.

Along with the $1.6 billion Transportation Infrastructure Financing and Innovation Act (TIFIA) loan last year from the U.S. Department of Transportation, the EFC loans will help keep tolls on the new bridge as low as possible.

The loans will be made from EFC’s Clean Water State Revolving Fund (CWSRF), which is used to support construction expenses that align with the environmental standards including those outlined in the New York-New Jersey Estuary’s Comprehensive Conservation and Management Plan.

The EFC loans will go toward environmental projects that will protect water quality and marine life in the Hudson River estuary, including protection of endangered sturgeon, oyster beds and other habitats, during and after construction of the New NY Bridge.

Environmental projects to be financed through EFC and the CWSRF include:

– Restoration of Piermont Marsh;

– Oyster bed restoration;

– River bottom armoring;

– Stormwater treatment at landings;

– Underwater noise protection (bubble curtains) during pile driving;

– Dredging and mound removal;

– Dredge material disposal;

– Removal of the existing bridge;

– Shared use path for pedestrians and bicycles;

– Endangered Peregrine Falcon nest box relocation;

– Net conservation benefit plan (Atlantic sturgeon);

– Channel Restoration of Gay’s Point.

[mappress]

Press Release, June 17, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free