Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Middle Pass Channel Dredging Wrapped Up, DPC Says
Business & Finance

June 17, 2014 · about 12 years ago

Australia: Middle Pass Channel Dredging Wrapped Up, DPC Says

Dredging of Middle Pass Channel, adjacent to Charles Point Patches, has been completed and Darwin Port Corporation has been able to achieve the targeted depth of 14.0 metres LAT. From the date of this announcement the following operating criteria apply: – Vessels departing Middle Arm with draft of 1

1 minutes read
  • LinkedIn
  • X
  • Email

Dredging of Middle Pass Channel, adjacent to Charles Point Patches, has been completed and Darwin Port Corporation has been able to achieve the targeted depth of 14.0 metres LAT.

From the date of this announcement the following operating criteria apply:

– Vessels departing Middle Arm with draft of 12.0 meters or less do not require sailing windows;

– Vessels departing East Arm Wharf with a draft of 10.7 meters or less do not require sailing windows;

– Vessels of 200 meters overall length and/or 10.7 meters or greater draft will be required to embark/disembark their pilot at the outer pilot boarding ground.

Vessel draft information is crucial for safe navigation in Darwin Harbour.

[mappress]

Press Release, June 18, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

2 days ago

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

3 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

2 days ago
PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

3 days ago