Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Germany: Contractors Complete Pilot Dike Construction Scheme
Business & Finance

June 22, 2014 · about 12 years ago

Germany: Contractors Complete Pilot Dike Construction Scheme

The pilot dike construction at the Körkwitzer Bach near Ribnitz-Damgarten, approximately 40 km north-east of Rostock, has been completed. The 500 m section of the degenerated flood protection structure was reconstructed using a cover of ripened fine-grained and moderately organic dredged material. T

2 minutes read
  • LinkedIn
  • X
  • Email

The pilot dike construction at the Körkwitzer Bach near Ribnitz-Damgarten, approximately 40 km north-east of Rostock, has been completed.

The 500 m section of the degenerated flood protection structure was reconstructed using a cover of ripened fine-grained and moderately organic dredged material. The reconstructed dike section protects a polder area which partly lies beneath the sea water level and which is drained by a pumping station into the Körkwitzer Bach.

This system had lost its function and is now working again. The principal client of the dike construction is partner 3 of the DredgDikes project, the Water and Soil Association “Untere Warnow – Küste“ in Rostock. They will also be responsible for the maintenance of the dike. The planning and construction supervision was done by WASTRA-PLAN, Rostock, together with the DredgDikes partners.

The contractor was STIG-Bau GmbH, Bad Sülze. The dike is now waiting for instrumentation for future monitoring. Two sections of the dike will be instrumented with tensiometers and piezometers to monitor the infiltration of water into the dike.

Along the dike axis standpipes will be installed for manual measurement of the seepage line in case of flood events. Also, precipitation and temperatures as well as the water levels of the Körkwitzer Bach and the dike-parallel drainage dench will be recorded for long-term analysis of the hydrological situation at the construction.

A monitoring plan will be established among the project partners in which the tasks and responsibilities will be defined, to guarantee a high quality of monitoring and control after the lifetime of the DredgDikes project.

[mappress]

Press Release, June 23, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

2 days ago

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

3 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

2 days ago
PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

3 days ago