Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›JND Thomas Gets Ready for Machado Lake Dredging
Business & Finance

June 22, 2014 · about 12 years ago

JND Thomas Gets Ready for Machado Lake Dredging

JND Thomas Company, Inc., Riverdale, CA the major sub contractor with OHL,USA, Inc., to perform the dredging and mechanical dewatering activities, is currently mobilizing onto Machado Lake, Harbor City, CA. The scope of the work for the project includes removal and mechanical dewatering of approxima

1 minutes read
  • LinkedIn
  • X
  • Email

JND Thomas Company, Inc., Riverdale, CA the major sub contractor with OHL,USA, Inc., to perform the dredging and mechanical dewatering activities, is currently mobilizing onto Machado Lake, Harbor City, CA.

The scope of the work for the project includes removal and mechanical dewatering of approximately 239,000 cubic yards of lake sediment. Sediment removal, removal of accumulated materials from the bottom of lakes, rivers, harbors and other water bodies, is necessary because of the natural process of sedimentation due to erosion, urban runoff, and organic decay.

In this case, Machado Lake’s water depth has been significantly decreased due to sediment build-up over several decades. Removing the sediment will increase the lake capacity to handle storm flows, ameliorate eutrophic conditions, and control the growth of nuisance aquatic plant species.

For the project, JND Thomas will be utilizing its proprietary portable mechanical dewatering plant which has the smallest footprint within the industry. The saturated dredged sediment will be dewatered using geotextile dewatering tubes or other mechanical dewatering process within designated laydown areas and returned to the lake. The return water will be tested and treated prior to being discharged back into the lake.

Sediment removal will occur throughout the lake with specific focus on the northern and southern portions of the lake.

[mappress]

June 23, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

29 days ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

29 days ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago