DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Taganrog Port Berth No. 2 Up and Running (Russia)
Business & Finance

June 27, 2014 · about 12 years ago

Taganrog Port Berth No. 2 Up and Running (Russia)

In Taganrog Seaport the Azov Basin Branch has completed the overhaul of the mooring berth No. 2 intended for anchorage and repair of the vessels of the branch on the production and repair base of the Taganrog Department of the branch. The overhaul of the object has been made by the contracting organ

1 minutes read
  • LinkedIn
  • X
  • Email

In Taganrog Seaport the Azov Basin Branch has completed the overhaul of the mooring berth No. 2 intended for anchorage and repair of the vessels of the branch on the production and repair base of the Taganrog Department of the branch.

The overhaul of the object has been made by the contracting organization, involved by the branch on a competitive basis, in a timely manner. In the course of the works the front wall has been renovated over the length of 89 meters, also 6 mooring devices, barrier curb and 40 fenders have been installed.

On-site all the existing drawdowns of the coverage of the facility have been eliminated, and in the quay part of the mooring berth maintenance dredging have been performed with bringing the bottom marks along the mooring berth to 4 meters.

Successfully executed overhaul of the facility has not only allowed extending the life of this hydraulic structure, but also in some ways improving its performance characteristics, as well as implementation of the requirements for safe mooring and berthing along the mooring berth.

[mappress]

Press Release, June 27, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free