Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Foreshore Technology Release Dredge Master Pile
Business & Finance

July 11, 2014 · about 12 years ago

Foreshore Technology Release Dredge Master Pile

Foreshore Technology have released Dredge Master Pile, a monitoring and guidance system specifically designed to improve operators efficiency on piling projects. Dredge master pile is based on Foreshore’s ground breaking Dredge Master platform and provides the operators with an intuitive system to h

1 minutes read
  • LinkedIn
  • X
  • Email

Foreshore Technology have released Dredge Master Pile, a monitoring and guidance system specifically designed to improve operators efficiency on piling projects.

Dredge master pile is based on Foreshore’s ground breaking Dredge Master platform and provides the operators with an intuitive system to help them with their piling work. With a built in pile library of all the common pile sections and the ability to load in pile designs from AutoCAD drawings, the software allows the pile layout to be inputted and shown in 3D to allow the operator to clearly see the required design.

With the pile layout in the software the operator can simply follow the onscreen symbols to guide them directly to the piles in the most efficient manner possible. With support for rake angles in any direction the software calculates the required pitch and roll of the Piling Rig to ensure that the operator drives the pile in the right location and at the correct angle.

As with all the DredgeMaster products, survey data can be loaded in to the application to allow the operator to see when the pile toe is approaching the seabed floor. This is useful as when the pile starts to enter the seabed floor there is often movement that needs adjustment by the operator.

[mappress]

Press Release, July 11, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

2 days ago

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

3 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Isle of Palms dredging update: Marinex makes steady progress
Beach Nourishment

Isle of Palms dredging update: Marinex makes steady progress

2 days ago
PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper
Canal Dredging

PHOTO OF THE DAY: Watermaster dredger busy in Barangay Talomo Proper

3 days ago