Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Barth Pond Dredging About to Commence
Business & Finance

August 10, 2014 · about 12 years ago

USA: Barth Pond Dredging About to Commence

The Downers Grove Park District is partnering with the Village of Downers Grove for a dredging project at Barth Pond in Patriots Park. The project, which will begin this week and take around four months, is needed to help improve the health of the pond for plants and aquatic life. Over the next four

2 minutes read
  • LinkedIn
  • X
  • Email

The Downers Grove Park District is partnering with the Village of Downers Grove for a dredging project at Barth Pond in Patriots Park. The project, which will begin this week and take around four months, is needed to help improve the health of the pond for plants and aquatic life.

Over the next four months around two feet of silt will be “hydraulically dredged” from the pond bottom using a floating barge. During this time the east parking lot (55th Street and Grand Ave) will be closed to the public.

Barth Pond was originally constructed to serve as a Village of Downers Grove stormwater detention facility, and receives water from neighborhoods to the southeast and southwest of Patriots Park. Over many years, deposits of silt and algae have accumulated on the pond bottom, decreasing it from the original 5-foot depth to approximately 3 feet or less in some areas today.

These current conditions have resulted in poor aquatic habitat for fish and other animals found in a healthy pond. Since the pond serves as a Village stormwater detention facility, the Village of Downers Grove will be partnering with the Park District to complete the removal of this accumulated silt material.

The dredged material will be pumped through pipes to a processing area at the east end of the park, where the silt will be dried using a centrifuge de-watering machine and loaded directly into trucks for removal.

Other de-watering methods could require storing the silt within the park in large de-watering bags, often for several months at a time, but this approach will allow the material to be removed immediately.

While the recent shoreline improvements such as new aquatic plantings will help to improve aquatic habitat, removing the accumulated silt is a critical step in restoring the health of Barth Pond. A deeper pond will result in less algae growth and allow more fish to survive the winter months.

[mappress]

Press Release, August 11, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago