Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps Conducts Geotechnical Analysis on Rio Grande Levee
Business & Finance

August 13, 2014 · about 12 years ago

Corps Conducts Geotechnical Analysis on Rio Grande Levee

The United States Section of the International Boundary and Water Commission (USIBWC) has hired experts from the U.S. Army Corps of Engineers to conduct geotechnical investigations on the U.S. Rio Grande flood control levee near Brownsville, Texas. The USIBWC requested the work after cracks were det

1 minutes read
  • LinkedIn
  • X
  • Email

The United States Section of the International Boundary and Water Commission (USIBWC) has hired experts from the U.S. Army Corps of Engineers to conduct geotechnical investigations on the U.S. Rio Grande flood control levee near Brownsville, Texas.

The USIBWC requested the work after cracks were detected this spring in a part of the levee located 80-100 feet from the Rio Grande. The cracks pose no immediate flood risk at current river levels and are considered safe under conditions similar to the 2010 flood.

During that flood, the worst in 43 years, floodwaters did not reach the affected levee segment.

The cracks, which are primarily located at or near the top part of the levee, run generally parallel to the river within an 800 foot segment near the Gateway International Bridge. The deep cracks are several inches wide in some locations. USIBWC discovered the cracks during a routine levee inspection. Other cracks have been noted in the floodplain along the river and on a nearby service road.

The Corps personnel conducted an initial site visit June 30 – July 3 and began detailed geotechnical investigations at the end of July. The investigations are intended to determine the cause of the cracking and, if necessary, develop possible repair solutions.

The Corps is scheduled to complete its investigations and make preliminary recommendations by October.

[mappress]

Press Release, August 13, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago