DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Crabtree Swamp Restoration Project Wins EPA Award
Business & Finance

August 20, 2014 · about 12 years ago

Crabtree Swamp Restoration Project Wins EPA Award

U.S. Environmental Protection Agency (EPA) yesterday awarded Horry County with the regional 2014 EPA Rain Catcher Award in the Neighborhood/Community Category for the Crabtree Swamp Restoration Project in Conway, South Carolina. The award was given at an award ceremony during the Environmental Prote

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Environmental Protection Agency (EPA) yesterday awarded Horry County with the regional 2014 EPA Rain Catcher Award in the Neighborhood/Community Category for the Crabtree Swamp Restoration Project in Conway, South Carolina.

The award was given at an award ceremony during the Environmental Protection Agency, Region 4/International Erosion Control Association Municipal Wet Weather Stormwater Conference, in Charlotte, North Carolina.

The Crabtree restoration effort consisted of two projects focusing on a strategy of controlling sediment transport to address fecal bacteria, dissolved oxygen, and to reduce turbidity. The effects of urbanization had greatly altered the Crabtree canal, leading to increased runoff volumes, peak flow rates, flooding, and water quality impairments.

The projects utilized a two-stage design to reconnect the canal with the remnant hardwood floodplain via a gently sloping riparian bench. The new channel configuration provides for flood storage and bank stabilization, and increased biological habitat.

[mappress]

Press Release, August 20, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free