DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Downtown Montauk Stabilization Project Open for Comments
Business & Finance

August 27, 2014 · about 12 years ago

Downtown Montauk Stabilization Project Open for Comments

The U.S. Army Corps of Engineers, New York District today announced the availability of the Draft Environmental Assessment (DEA) with Draft Finding of No Significant Impact (DFONSI) for the proposed Downtown Montauk Stabilization Project and the opening of a 30-day review period, in which the public

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New York District today announced the availability of the Draft Environmental Assessment (DEA) with Draft Finding of No Significant Impact (DFONSI) for the proposed Downtown Montauk Stabilization Project and the opening of a 30-day review period, in which the public can submit written comments.

The proposed Downtown Montauk Stabilization Project calls for the construction of a geotextile sandbag reinforced dune and berm in front of the downtown area of Montauk to manage the risks associated with coastal storms.

It will involve the construction of a reinforced dune made of sand-filled geotextile bags with the top at an elevation of +13.5 feet NGVD with an additional +3 feet of sand cover making the entire reinforced dune +16.5 feet NGVD.

The dune will slope seaward for 35 feet reaching an elevation of +9.5 feet NGVD, where a 45-foot-wide elevated berm will be constructed, maintaining that +9.5 feet NGVD elevation for its width until sloping into the sea. The construction will involve roughly 14,000 geotextile bags filled with sand, weighing approximately 1.7 tons each.

The project will involve roughly 71,000 cubic yards of sand, 51,000 of which will be trucked to the project area.

The Downtown Montauk Stabilization Project is designed to be constructed to provide near-term coastal storm risk management while the Corps of Engineers completes the ongoing Fire Island Inlet to Montauk Point Reformulation Study looking at long-term coastal storm risk management alternatives along the south shore of Suffolk County, including the Montauk area.

[mappress]

Press Release, August 27, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free