Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Salem Lateral Project Includes Dredging
Business & Finance

September 9, 2014 · about 12 years ago

Salem Lateral Project Includes Dredging

Algonquin Gas Transmission, LLC, is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with constructing a pipeline project in Beverly Harbor and Collins Cove in Salem, Mass. The proposed project involves work, structures

1 minutes read
  • LinkedIn
  • X
  • Email

Algonquin Gas Transmission, LLC, is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with constructing a pipeline project in Beverly Harbor and Collins Cove in Salem, Mass.

The proposed project involves work, structures and the discharge of fill material below the high tide line of waters of the U.S. in order to construct the Algonquin Gas Salem Lateral Project.

The project includes the installation of 1.2 miles of new 16-inch diameter pipeline from the existing Hubline pipeline in Beverly Harbor to the Salem Harbor Electric Station to supply natural gas for electricity generation. The Salem Lateral Project begins at a new subsea tap connection with the Hubline pipeline and will run south to the Salem Harbor Electric Station.

The Salem Lateral will cross the marine areas of Beverly Harbor and Collins Cove using horizontal directional drilling to minimize impacts to the marine environment. The project will require the hydraulic dredging of an 85-foot by 55-foot area of the seafloor to a depth of -8.5 feet in Beverly Harbor.

Approximately 1,500 cubic yards of sediment will be excavated and placed in hopper barges for temporary storage and decanting. The decanted material will then be placed back into the cofferdam.

The public notice, with more specifics on the proposed work, can be viewed on the Corps website.

[mappress]

Press Release, September 10, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago