Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Improvement Work Starts on the Dawlish Seawall (UK)
Business & Finance

September 30, 2014 · about 12 years ago

Improvement Work Starts on the Dawlish Seawall (UK)

Construction has begun on a £8 million project to increase the resilience of the sea wall in Dawlish, UK. Mott MacDonald is providing project and commercial management on the project, which will also see the lower coastal walkway replaced at high level, on behalf of Network Rail. In February 2014, t

1 minutes read
  • LinkedIn
  • X
  • Email

Construction has begun on a £8 million project to increase the resilience of the sea wall in Dawlish, UK. Mott MacDonald is providing project and commercial management on the project, which will also see the lower coastal walkway replaced at high level, on behalf of Network Rail.

In February 2014, the path and railway line was severely damaged by massive waves which left the south-west of England without a rail connection for two months. The walkway is the final section of footpath between Dawlish Warren and Teignmouth to be repaired following the damage.

The project will raise a 340m stretch of low level sea wall to adjoin the existing high level walkway. The section will be constructed using precast concrete L units and ballast backfill. All works will be undertaken from the seaward side of the railway using two jack-up barges.

James Whitelock, Mott MacDonald’s project director , said: “ The main challenges we will face on this project are the weather and sea conditions. With winter fast approaching the aim is to complete the works in as short a time frame as possible, before any major winter storms.”

Mott MacDonald provided project management and cost control services to Network Rail during the track reinstatement work that took place on the storm damaged Dawlish railway line earlier this year.

The project is due for completion in 2015.

[mappress]

Press Release, September 30, 2014

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago