The upper Hudson River dredging project, administered by the United States Environmental Protection Agency (EPA) and General Electric (GE), is continuing during the 2014 Navigation Season between Lock C-4 in Stillwater and Lock C-8 in Fort Edward.
The dredging operations are lighted, have day shapes and arrow boards displayed. Boaters should follow all instructions as indicated.
Activities Planned for the Week of October 13, 2014:
Additional informational signs have been posted in the project area.
[mappress]
Press Release, October 14, 2014