Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kari Hege Continues Dredging at Port of Wells
Business & Finance

October 16, 2014 · about 11 years ago

Kari Hege Continues Dredging at Port of Wells

The dredger “Kari Hege” will be engaged in dredging operations in the main channel North of number 4 buoy, between buoys four and two for week commencing 20th October 2014, reported today the Port of Wells. Vessels entering or exiting the harbor should call the “Kari Hege” when working, on channel 1

1 minutes read
  • LinkedIn
  • X
  • Email

The dredger “Kari Hege” will be engaged in dredging operations in the main channel North of number 4 buoy, between buoys four and two for week commencing 20th October 2014, reported today the Port of Wells.

Vessels entering or exiting the harbor should call the “Kari Hege” when working, on channel 12 or harbor staff if it’s not working. All prearranged dredging areas are constrained by the weather and wave heights therefore operations are subject to change on a daily basis.

The Port’s dredger “Kari Hege” operates from Monday to Friday. Its normal area of work is in the main channel between buoy number 12 and buoy number 1. It works during the low water period, starting three hours after high water until three hours prior to the next high water. The “Kari Hege” will manoeuvre into its dig position, or back to its mooring, approximately half an hour before or after this time.

Any larger vessels intending to pass the “Kari Hege” in the channel during digging operations or while it is manoeuvring should call the dredger up on Channel 12 to ascertain which is the safe side to pass.

All material removed from the channel during dredging operation is placed on the berm which is marked by the Port hand channel buoys.

[mappress mapid=”18937″]

Press Release

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago