Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Geelong Dredging Project Wrapped Up
Business & Finance

October 21, 2014 · about 11 years ago

Geelong Dredging Project Wrapped Up

The channel safety dredging program for the largest regional port in Victoria, the Geelong Dredging Project 2014 has been finished, according to the Victorian Regional Channels Authority (VRCA). Dredging was conducted in the vicinity of No 4 Corio Quay North in an area off the corner of the Hopetoun

2 minutes read
  • LinkedIn
  • X
  • Email

The channel safety dredging program for the largest regional port in Victoria, the Geelong Dredging Project 2014 has been finished, according to the Victorian Regional Channels Authority (VRCA).

Dredging was conducted in the vicinity of No 4 Corio Quay North in an area off the corner of the Hopetoun and City Channels commonly referred to as the City Bend.

NZ-based Heron Construction Company performed the work by using its backhoe dredger Machiavelli. Two split-hopper barges, maneuvered by tugs, assisted the Machiavelli on a 24/7 bases during the project.

The Geelong Dredging Project 2014 involved:

Dredging at City Bend, the right angle turn at the junction of Hopetoun and Corio channels that ships navigate on their way to and from Geelong’s port. About 130,000 cubic meters of mainly sand, silt and soft clay was removed from four small areas on the inside of the bend to widen the turn and aid safe navigation of ships.

Dredging of about 65,000 cubic meters of soft material at Corio Quay North No 4 Berth to boost its productivity and operational efficiency. The berth and its approach is deepened by 1.3 meters to bring it into line with the main shipping channels, maintained depth of 12.3 meters. This will remove constraints on ships currently unable to load down to the maximum draught that can navigate the channels.

The $9 million Geelong Dredging Program was funded by VRCA and will ensure the Port of Geelong, Victoria’s premier bulk cargo port, keeps its competitive edge and strong focus on safe navigation.

[mappress mapid=”18963″]

Dredging Today Staff

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago